ABB PCS 6000 System Distribution Panel GRB Opening Time Verification PCM02 3BHE057853R0001

Date: Sept 11, 2025 Views: 460

  The response time of the Grid Breaker (GRB) has to be checked according to the manufacturer's specifications (responsibility of customer). For the ABB converter, the GRB opening time has to be less than the specified limit in the Preventive Maintenance Report.

  Insulation Measurement 1CL

  The insulation resistance of the converter components must be measured to verify their ability to withstand voltage stress. The results of the measurements must be noted in the Preventive Maintenance Report.

  IMPORTANT! A high voltage insulation tester with a test voltage of 2500 VDC (eg, METRISO 5000) is required to perform the insulation measurements. The water conductivity must be lower than 0.5 µs/cm during the insulation measurements.

  1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”,3BHS600000 E22.

  2. Visually check that the LEM current transducer cables do not touch the medium voltage busbars.

  3. Shorten the following points:

  • AC grid Side: phases U,V,W

  • AC generator side: phases U,V,W

  • DC-link+ N -: X801, X803, X805 (inside DLU)

  • Filter Capacitors: C541-C544, C461, C581 - C587

  • Braking Resistor: X801-X802, X804-X805 (inside DLU)

  4. Disconnect the following components:

  • Ground Connection HFM: R544.2

  • Ground Connection NCM: C461.2

  • Ground Connection VFM: C587.2

  • Pre-charger PCM: Remove fuses F421-F423 and ground PCM

  • HVD-board: -U706, remove link to PECINTM (sub-d connector)

  5. Open the following switches:

  • GEB / GDM: Open disconnector and ground generator

  • Earth Isolator: Q801

  6. Apply a test voltage of 2500 VDC between the shortened phases and ground as shown in Fig. 4–3 for at least 1 minute.

  Figure 4–3 Insulation measurements PCS6000 Converter 1CL with PCM

  Figure 4–4 Insulation measurements PCS6000 Converter 1CL without PCM

  7. Verify that the measured circuit is discharged

  8. Close the ground switch

  9. Reconnect all components

  10. Remove all temporary bridges

  11. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70

  Insulation Measurement 2CL

  Effort 2 - 4 h

  The insulation resistance of the converter components must be measured to verify their

  ability to withstand voltage stress. The results of the measurements must be noted in the

  Preventive Maintenance Report.

  IMPORTANT! A high voltage insulation tester with a test voltage of 2500 VDC (eg, METRISO

  5000) is required to perform the insulation measurements. The water conductivity must be

  lower than 0.5 µs/cm during the insulation measurements.

  1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”,

  3BHS600000 E22.

  2. Visually check that the LEM current transducer cables do not touch the medium voltage

  busbars.

  3. Shorten the following points:

  • AC grid Side of each CL: phases U,V,W

  • AC generator of each CL: phases U,V,W

  • DC-link+ N - of each CL: X801, X803, X805

  • DC-link between CL1 and CL2: X801

  • Filter Capacitors of each CL: C461, C581 - C587

  • Braking Resistor of each CL: X801-X802, X804-X805

  4. Disconnect the following components:

  • Ground Connection NCM: C461.2

  • Ground Connection VFM74: C587.1

  • Ground Connection VFM73: C584.1

  • Pre-charger PCM of each CL: Remove fuses F421-F423 and ground PCM

  • HVD-board: -U706, remove link to PECINTM (sub-d connector)

  5. Open the following switches:

  • GDM of each CL: open disconnector and ground generator and transformer

  • Earth Isolator of each CL: Q801

  6. Apply a test voltage of 2500 VDC between the shortened phases and ground as shown in Fig. 4–5 for at least 1 min.

  Figure 4–5 Insulation measurements PCS6000 Converter 2CL

  7. Verify that the measured circuit is discharged.

  8. Close the ground switch.

  9. Reconnect all components.

  10. Remove all temporary bridges

  11. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.

  . GDM performance check

  Effort 0 - 2 h

  1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.

  2. Double check that the DC-link is grounded (ground switch).

  3. Visual inspection insulators active parts.

  4. Control bolt fixations and connections.

  5. Greasing shaft and chain motor drive.

  6. Check the motor drive.

  7. Operation functioning test (Open, Closed, Earth).

  8. Record the switching time in the Preventive Maintenance Report.

  9. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.

3BHS600000_E80_RevF_Service_Manual_PCS6000(1)Goods inspection(2).pdf


Recommended Products:
3BHE057825E16 PCM12

ABB 3BHE057825E16
ABB 3BHS868401E16
ABB 3BHS866401E27
ABB 3BHE055094E47
ABB 3BHE044916E27
ABB 3BHE056532E26
ABB 3BHE05632R0001
3BHE056532E16 GRB2
ABB 3BHE056532E16
3BHE046081E16 DLU74
3BHE051397E16 POM72
ABB 3BHE051397E16
3BHE051398E16 POU72
3BHE054801E16 GBM51
3BHE055094E16 GBU72
ABB 3BHE054801E16
3BHE056532E16 CCU14
More...

RELATED ARTICLE

Contact information

Address

Room 205, Office Building, No.1 Chaoyang North Road, Longwen District, Zhangzhou City, Fujian Province

Email

fengyunfadacai@qq.com

Sales consultant

Miss.Green

Whatsapp

+86 15860249102

Online Message

Copyright © 2023-2024 Zhangzhou Fengyun Electrical Equipment Co., Ltd

Copyright © 2023-2024
Zhangzhou Fengyun Electrical Equipment Co., Ltd