Effort 2 - 4 h
Replacement means exchange of components as part of the maintenance schedule or as a consequence of performed visual inspection or performance checks.
The procedures to replace components are described in chapter 7, Checking control components, page 81 or in chapter 10, Replacing power and cooling components, page 133. The corresponding sections are depicted in the following table.
For replacement tasks without a description of the replacement procedure in this service manual, always shut-down the PCS6000 according to “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22 Switch off the corresponding MCB (see electrical diagram) before replacing the component. Restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.
DC-link performance check
Effort 0 - 2 h
The DC-link charging for performance check is performed via the test module of the converter HMI.
IMPORTANT! The measurement results are compared to the nominal values in the “PCS6000 Preventive maintenance report”, 3BHS600000 E84.
The deviation of the measured values from the nominal values is grouped in 3 categories:
– OK: The measurement result is in the expected range.
– Monitor: The measurement result is near the limit.
The respective component is still OK, but it makes sense to compare previous and future measurements to monitor a trend, as well as to compare similar measurements taken with the same instrument.
– Action: The respective component might be faulty and should be replaced.
Procedure:
1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.
2. Close all doors.
3. Open DC-link grounding switch.
4. Charge the DC link up to +/-500V.
5. Record the discharging time from +/-500 to +/-200V.
6. Record the discharge time in the Preventive Maintenance Report.
7. If the converter is a 2CL system, repeat the test with the second conversation line.
8. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.
DC-link component check
Effort 4 - 8 h
The DC-link component check has to be done as described below, if the procedure in section 4.4.5, DC-link performance check, page 56 shows a deviation from the nominal value more than 10%.
IMPORTANT! A standard multimeter with capacitance measuring function (up to 10 mF) is required to perform these measurements.
The measurement results are compared to the nominal values in the Preventive Maintenance Report. The deviation of the measured values from the nominal values is grouped in 3 categories:
– OK: The measurement result is in the expected range.
– Monitor: The measurement result is near the limit.
The respective component is still OK, but it makes sense to compare previous and future measurements to monitor a trend, as well as to compare similar measurements taken with the same instrument.
– Action: The respective component might be faulty and should be replaced.
Procedure:
1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.
2. Double check that the DC-link is grounded (ground switch).
3. Remove reinforcement plates and the ASM10 (Auxiliary Supply Module).
4. Disconnect the three sets of measurement the wires (1, 2 and 3) which connect the DClink capacitors (C701…C703) to the converter.
5. Record the serial number of each capacitor in the Preventive Maintenance Report.
6. Measure the capacitance of Grid side Power Module Capacitors (see electrical circuit diagram POMxx).
7. Measure the capacitance of Generator side Power Module Capacitors (see electrical circuit diagram POMxx).
8. Reconnect the wires/busbars from the converter with the marked tightening torque (see separate sticker on the capacitor) to the capacitors
NOTE – If the tightening torque is not specified on the capacitor, use tightening torque defined under section 10.4.1, Correct tightening torques of bolted connections, page 135.
9. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.
Filter components performance check
IMPORTANT! A standard multimeter with capacitance measuring function (up to 10 mF) is required to perform these measurements.
The measurement results are compared to the nominal values in the Preventive Maintenance Report. The deviation of the measured values from the nominal values is grouped in 3 categories:
– OK: The measurement result is in the expected range.
– Monitor: The measurement result is near the limit.
The respective component is still OK, but it makes sense to compare previous and future measurements to monitor a trend, as well as to compare similar measurements taken with the same instrument.
– Action: The respective component might be faulty and should be replaced.
The filter components performance check comprises the following 3 parts:
– Grid side filter components performance check (see section 4.4.7.1, Grid side filter components performance check, page 59)
– Neutral point performance check (see section 4.4.7.2, Neutral point performance check, page 61)
– dv/dt filter components performance check (see section 4.4.7.3, dv/dt filter components performance check, page 61)
Grid side filter components performance check
1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.
2. Double check that the DC-link is grounded (ground switch) and the grid side is grounded (grounding kit).
3. Disconnect the PE wire to -R544:2 in cabinet +A12. (see electrical circuit diagram HFMxx).
4. Measure the resistance of -R544 between -R544:2 (the disconnected pin) and -R544:1.
5. Measure the capacitance between -X541/2:3 and -X541/2:4 (12 capacitors parallel, when grid side grounded).
6. Reconnect the removed connection.
7. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.
Neutral point performance check
1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.
2. Double check that the DC-link is grounded (ground switch).
3. Disconnect the wire from:
• +A23-R461 pin2
• +A23-R462_1 pin1
• +A23-R463 pin 1
See electrical circuit diagram NCM10
4. Measure the capacitance of -C461 between -C461:1 and Ground.
5. Measure the resistance of -R461 between -R461:1 and -R461:2.
6. Measure the resistance of -R462 (over both two resistances) between -R462_1:1 and Ground.
7. Measure the resistance of -R463 between -R463:1 and -R463:2.
8. Measure the resistance of -R463 between -R464:1 and -R464:2
9. Reconnect the removed connections.
10. After completing all work, restart the PCS6000 according to section 5.4, Start-up after maintenance or troubleshooting, page 70.
dv/dt filter components performance check
1. Shut down the PCS6000 according to the “PCS6000 Lockout/tagout procedure”, 3BHS600000 E22.
2. Double check that the DC-link is grounded (ground switch) and the generator side is grounded.
3. Measure the resistance of -R581 and -R582 (connected in series) in cabinet +A11 between -R581:2 and -R582:1.
4. Measure the resistance of -R583 and -R584 (connected in series) in cabinet +A11 between -R583:2 and -R584:1.
5. Measure the resistance of -R585 and -R586 (connected in series) in cabinet +A11 between -R585:2 and -R586:1.
6. (see electrical circuit diagram VFMxx)
7. Measure the capacitance between -C581:2 in cabinet +A11 and Ground (7 capacitors parallel when generator side grounded).
8. Measure the resistance between -C581:2 in cabinet +A11 and Ground. The measurement is passed when Rmeasured rises to OL (OverLoad).
9. After completing all work, restart the PCS6000 according to section 5.4,
Start-up after maintenance or troubleshooting, page 70.
3BHS600000_E80_RevF_Service_Manual_PCS6000(1)Goods inspection(2).pdf
Recommended Products:
3BHE057825E16 PCM12
ABB 3BHE057825E16
ABB 3BHS868401E16
ABB 3BHS866401E27
ABB 3BHE055094E47
ABB 3BHE044916E27
ABB 3BHE056532E26
ABB 3BHE05632R0001
3BHE056532E16 GRB2
ABB 3BHE056532E16
3BHE046081E16 DLU74
3BHE051397E16 POM72
ABB 3BHE051397E16
3BHE051398E16 POU72
3BHE054801E16 GBM51
3BHE055094E16 GBU72
ABB 3BHE054801E16
3BHE056532E16 CCU14
More...
RELATED ARTICLE
Address
Room 205, Office Building, No.1 Chaoyang North Road, Longwen District, Zhangzhou City, Fujian Province
fengyunfadacai@qq.com
Sales consultant
Miss.Green
+86 15860249102